Hydrological Status of the spawning ground of Acipenser sinensis...-长江水产研究所 长江水产研究所

Hydrological Status of the spawning ground of Acipenser sinensis...

Abstract: The spawning runs of Chinese Sturgeon (CS; Acipenser sinensis) were observed 37 times below Gezhouba Dam of Yangtze River between 1983 and 2004. Five hydrological factors (water temperature, water level, flow discharge, silt content and current velocity) were monitored on a daily basis at the spawning ground between October and November for 22 consecutive years(1983–2004). The effect of current velocity on the spawning ground at the bottom layer of the river, where CS was spawning for four years, was measured (1996–1999). The authors of this study analyzed the relationship between the five hydrological factors and the respective spawning runs. Twenty-two years of continuous observations indicated that the daily mean values of all the five hydrological factors fluctuated within a certain range when CS was spawning. It was concluded that the optimal values for the hydrological factors during the spawning runs are 18.0–20.0℃ for temperature, 14100 m3/s for discharge volume, 42.0–45.0 m for water level above the sea level, and 0.2–0.3 kg/m3 for silt content in the water, wherein the current velocity above the bottom layer to stimulate the fish to spawn should be between 1.0–1.7 m/s...

附件下载:Yang Deguo, Wei Qiwei, Chen Xihua, et al. Hydrological Status of the spawning ground of Acipenser sinensis underneath the Gezhouba Dam and its relationship with the spawning runs. Acta Ecologica Sinica. 2007,27(3): 862-869. pdf